Case StudiesABOUTcontact
← Enterprise Agentic

✦ Case study 2 of 3 · AI Product Transformation

Live and evolving

Project Management

From disconnected automations to a unified execution strategy.

  • AI Product Strategy
  • Workflow Transformation
  • Human-Centered Automation

A collection of proposed AI agents was adding complexity to an already fragmented workflow. I reframed the opportunity around a single execution layer where project managers could review work completed on their behalf, act on recommendations, and progressively automate decisions as trust increased.

100%template structural accuracy
~80%business-accepted plan quality threshold reached
20active project-plan users
122employees titled Project Manager: the enterprise opportunity
Role
Product vision, interaction strategy and design lead
Partners
A designer, engineering, the business sponsor, an advisory consultant
Users
Project managers running up to 20 projects at once
Status
Plans in active use; execution layer approved and in development

01The Challenge

Project managers were managing complex portfolios of client work across multiple systems, processes and sources of information. Some were responsible for as many as 20 projects simultaneously.

Beyond developing project plans, they were tracking hours, monitoring delivery risks, managing RAID logs, maintaining schedules, following up on actions and coordinating updates across systems. The accumulated administrative work created significant operational noise.

An advisory initiative had identified numerous opportunities for automation, but the proposals were largely framed as individual agents performing individual tasks. One of the first requests was to automatically read a statement of work, generate a project plan and post it into the appropriate file structure. The proposed implementation moved directly toward end-to-end automation.

I was brought in when the approach encountered execution problems.

02First, Make the Output Reliable

My initial discovery uncovered critical gaps. The proposed workflow hadn’t fully accounted for existing project-plan templates, downstream dependencies, or the level of human judgment needed to create a usable plan.

  • Plans needed to follow an exact structure. If AI generated information that violated it, downstream automations could fail.
  • There was no reason to assume an AI-generated plan would be complete or accurate enough to enter operational systems without validation.

I recommended a phased implementation rather than immediate full automation. Phase 1 was a manual upload experience: project managers generate plans, review the output and give feedback before anything downstream is automated.

Two acceptance requirements

1100% template structural accuracy

The generated plan had to follow the required structure to preserve downstream compatibility.

2~80% business-accepted content quality

The plan needed to be a useful starting point that project managers could refine and complete.

The second threshold was intentionally pragmatic. We weren’t trying to assign artificial precision to a subjective assessment. Users reported whether a generated plan was above or below the agreed threshold, so the business could decide whether the results were acceptable.

The goal was not to replace project managers’ judgment. It was to eliminate enough preparation work that their time could go to the decisions that mattered.

03Establishing Business Acceptance

The initial UAT period was planned for three weeks but extended to four, because participation was limited in the first week. I reported testing engagement and feedback quality to business stakeholders.

Working with the business sponsor, we reframed the exercise from testing a finished product to helping train and improve a solution that would reduce the team’s own workload. Participation improved, and we incorporated learnings from project managers’ existing AI experiments.

  • The SOW alone didn’t contain enough information for every required detail, so we added existing Smartsheet project plans and established business rules as context.
  • Where the information didn’t exist, we made the limitation explicit. Some decisions required human judgment that AI could not reliably reproduce from the available data.

Within four weeks

Generated plans reached 100% structural accuracy and the business-accepted quality threshold of approximately 80%. The business approved the result as a useful starting point for project managers.

04The Larger Opportunity

As I continued examining the proposed automations, a much broader opportunity became clear. The business didn’t need another collection of agents. It needed a way for project managers to manage the work those agents could perform.

The ideas included monitoring risks, updating plans, tracking actions, identifying changes, surfacing reminders and coordinating activities across systems. Built independently, project managers might receive more notifications and recommendations but still need to navigate multiple systems to complete the actual work. That wasn’t the transformation we were trying to achieve.

  • Risk monitoring
  • Plan updates
  • Action tracking
  • Change detection
  • Reminders
One execution layer One place to manage the work
  • Completed for you
  • Needs your attention
  • Awaiting your approval
Independent agents and source systems feed one shared experience, instead of another stream of notifications.

05The Strategy: One Execution Layer

I developed a product strategy for a unified execution experience across existing systems. Working with a designer, I led the product vision, interaction strategy and iterative design process. The experience organized work into three meaningful categories.

1Work completed for you

Actions already performed by automations or agents: visibility into what happened, without requiring intervention.

2Work requiring your attention

Reminders, overdue activities and situations where a project manager needs to act.

3Work awaiting your approval

Recommended actions with enough context to approve, modify, dismiss or defer them.

Once approved, agents and integrations could carry out the action in the appropriate underlying system. Don’t simply tell a project manager something needs to change. Give them a way to approve the change and have it completed.

Home

Project intelligence center

Inbox 14

Completed

Expired

Inbox

Project intelligence center

Needs approval (14)Automations (3)Notifications and reminders (3)
Customer ▾Urgency ▾↑ Relevance ▾

14 items to review · 5 urgent (36%)Urgent first, then by time left

36%43%21%

Urgent · high importanceExpiring soon · 2 days or lessOther

Client call

Expiring today

Triggered by Client Pulse Take action in Salesforce

Customer: Client A · Project: Network refresh · 1 of 3 from this event

Update the quote to the hardware quantity and licensing agreed on the call

84% AI confidence ⓘ

Does this proposed change look right?

AApproveThe proposed change looks right.

BDifferent answerRight item, but enter a different value.

CDismissDon’t make this change.

DNot sure yetCome back to this one later.

A sanitized view of the approved design for the execution layer: recommendations from client conversations arrive in one inbox, prioritized by urgency across the portfolio, with project and customer filters. Each one can be approved, corrected, dismissed or deferred, and every answer becomes feedback. Names and numbers are placeholders.

06A Proactive System, Not Another Task List

The execution layer was designed to surface work based on signals from multiple sources:

  • Client and delivery conversations
  • Contradictions between business systems
  • Defined business thresholds
  • Activities that didn’t happen on schedule

Rather than organizing everything by individual project, the experience brought relevant work across a PM’s portfolio into a single prioritized view. Urgency was defined by each underlying capability, with filters for specific projects or clients. That mattered most for people managing many concurrent projects.

The product was intended to reduce cognitive load, not create another place where users had to search for work.

07Reusing Enterprise Capabilities

  • I challenged the proposed approach for meeting transcripts. Instead of saving transcripts and re-ingesting them through separate downstream agents, I recommended reusing the existing Client Pulse ingestion capability and sharing the information with multiple agents through shared tools.
  • Project-related signals could be identified from conversations without building another independent ingestion workflow.
  • I recommended avoiding fragmented approval experiences embedded separately in every SaaS application or microservice. A consistent execution layer is easier to manage and gives one shared way to collect feedback.

These decisions let capabilities be developed independently while contributing to a larger product strategy.

08Building Trust Before Increasing Automation

Initially, agents could recommend actions while project managers kept approval authority. Each interaction produced useful feedback: did the project manager accept the recommendation, change it, or reject it? Over time, that could show which activities were predictable enough to automate.

  1. 1AI recommends
  2. 2Human reviews

    Accept, change or reject

  3. 3Feedback accumulates
  4. 4Business validates confidence

    Thresholds set by the risk of each action

  5. 5Appropriate actions become automated

Automation expands only after a risk-based confidence threshold is met and business stakeholders approve it.

Increasing automation based on evidence and business trust, rather than assuming everything should be automated from the beginning.

09Aligning Stakeholders Around the Vision

Some stakeholders initially struggled to see how the experience could be delivered incrementally without first defining and building every possible automation. I worked with the advisory consultant and business leaders to show how individual capabilities could be delivered independently, inside a consistent product experience that would expand over time.

The product designs made the strategy tangible. We refined the experience through leadership feedback, including the consolidated portfolio view and urgency-based prioritization. The broader vision received stakeholder approval before engineering began development.

10Delivery Status and Outcomes

100% structural accuracy achieved

AI-generated project plans met the required template structure after the four-week validation period.

~80% business-accepted content quality

User feedback supported business acceptance of generated plans as workable starting points, with human refinement still part of the process.

20 active project-plan users

Approximately 20 project managers were actively using the generated CSV project plans.

Enterprise-scale opportunity

122 employees were formally titled Project Manager, with more performing similar work.

Unified execution layer approved

The product vision and interaction design were approved, and engineering began development.

Still in development at the documented stage: Smartsheet integration, automated triggering, and call-driven recommendations for project-plan and RAID updates. The anticipated reductions in administrative effort had not yet been measured.

11The Larger Insight

The most useful question wasn’t how many agents we could build. It was how we could change the work itself.

By connecting fragmented activities into a consistent execution experience, the strategy created a path from individual automations toward coordinated work performed on behalf of project managers. And by keeping human judgment in the process, we could learn where automation was appropriate before removing that oversight.

The goal wasn’t to automate every decision. It was to give people back the time they spent on work that didn’t require their judgment.

← PreviousClient Pulse Next →Building an AI-Native Organization
anne mashimo

Let's talk about what you're building.

I connect enterprise strategy with the realities of execution, and I'm always up for a hard problem.

Email me →

Explore

  • Home
  • Case Studies
  • About
  • Search

Case Studies

  • Enterprise Agentic
  • Enterprise GenAI
  • NFHS Network
  • Fitted
  • More case studies →

Connect

  • LinkedIn ↗
  • Email
  • Resume (PDF)
© 2026 Anne Mashimo Back to top ↑